|
Q: |
What amount of processing downtime is attributable to the inability to control the electrical environment? |
|
A: |
Composite Engineering reports that in 1980 approximately 3% of processing downtime was attributable to the lack of infrastructure management. By 1990, this figure had reached 27%, and it is projected to be 47% by the year 2000.
|
|
Q: |
What should I include in a Power Quality Program? |
|
A: |
- Establish a Power Quality team.
- Develop protection philosophy.
- Develop procurement standards for electrical and electronic equipment.
- Insist on procurement standards that emphasize value, not just low cost.
|
|
Q: |
Why do I want a power quality profile for my company's equipment? |
|
A: |
- Identify sources of interference.
- Identify capacity problems.
- Find oppportunities for energy conservation and utility rate reduction.
- Provide a framework for planning for the installation of new equipment and for expansion.
|